Capability at HIFAB is not sourced — it is built, trained and controlled in-house, from people and processes to silicone bonding, colour, fire safety and quality systems.

A Dedicated Silicone Room, Backed by Our Approved Quality Bond Partnership With

Fully Automated Spray, Cure and Handling
Approved Plant
40 m. ton per day coating capacity
In-House Powder Coating LineColour and finish are produced entirely in house on a fully automatic line, removing dependency on third party job work and keeping every profile on every project to the same finish standard.
Tested Performance | Verified System | Extended Duration
| Application | Fire-Rated Façade |
|---|---|
| Test | PMU Fire Test |
| Test Status | Successfully Passed |
| Reference Duration | 2 Hours |
| Achieved Duration | 20%+ Beyond 2 Hours |
| Glazing Partner | Vetrotech |
| Protection Focus | Fire Containment + Heat / Radiation Control |
| System Approach | Façade + Fire-Resistant Glazing |
The quality of a façade depends as much on the people executing it as on the system being specified. At HIFAB, we provide continuous training to keep our teams aligned with evolving systems, processes, safety practices, and quality standards, strengthening capability from the factory floor to the project site.
Every facade brings a different set of architectural, structural and performance requirements. Our in-house R&D team studies these requirements to develop, refine and validate solutions before they move into execution helping turn design intent into systems that can perform in real conditions.
Quality at HIFAB is not a final-stage check. It is built into every stage of execution. Our in-house QA/QC team follows defined inspection, testing and documentation protocols from incoming materials to installation and post-occupancy ensuring that what is specified, manufactured and installed consistently meets the required standards.